Films

We film the floor, not a set.

6 films, 11:51 in total. The company film, the cut that runs on the wall of a distributor's showroom, and the loops built for Stall C1 at Bharat Mandapam.

BKC, the film

The company film. The building, the line, the checking bench and the dispatch floor, cut with a soundtrack.

The television cut

The same film, graded and timed for a screen on a wall. Silent.

Stall C1, the loop

Nineteen beats, silent by construction, fading to and from black so the seam is invisible. Built to run all three days at Bharat Mandapam.

The exhibition wall

Forty feet of wall, three panels, one programme.

A centre screen with a wing either side, each cut to the panel it was built for rather than cropped from one master. Seven cases, crossfaded, silent, looping all three days.

Video wall, centre

The centre screen of the 40 foot exhibition wall. Seven cases, crossfaded.

Video wall, left wing

The left wing, cut vertically to the panel it was built for.

Video wall, right wing

The right wing. Same loop, mirrored programme.

Offcuts

The rest of the shoot.

Loops taken out of the same day on the floor. Silent, a few seconds each, cut to sit under type rather than to be watched on their own.

HD+ Combo, as it ran on the exhibition wall.
The plant and its roof, from the air.
Automated assembly, panel into frame.
Bonding station, display under the head.
Impact rig, weighted head over the pedestal.
The aisle, stocked to the ceiling.
BKC and NEXSA boards over a row of mobile shops.
The distribution graphic from the company film.